Inchon Seo-gu, South Korea

Inchon, Mined Caverns LPG Storage Facility

Project description

Réalisation d’un stockage souterrain de 343 000 m3 de Propane et 136 000 m3 de Butane en cavités minées.

Work carried out and added value of our solution

  • Preliminary and feasibility studies
  • Basic design
  • Supervision of construction, acceptance test and commissioning
  • Assistance to operation

Back to references

Come tell us about your project

Geostock provides a complete range of services covering the entire life cycle of an underground storage project.

Contact us

Cavité minée – Mined Roeck Cavern
Control room of operated site
Shalapa site operated by Geostock